Flood Risk Assessment - Medium Risk 5000
Flood Risk Assessment - Medium Risk 5000
Developments under 5,000 square metres within flood zone 2 and 3
Perfect Solution for:
Developments within flood zone 2 and 3 depending on user vulnerability
4-9 dwellings less than 5,000 square metre or 0.5 ha
Office/light industrial, general industrial and retail under 0.5ha
Travelling community site between 0 and 9 pitches
Developments within flood zone 2 and 3 without hydraulic modelling
Key Benefits:
First Draft in 48 hrs with the final report in 20 working days
Environment Agency feedback on the Flood Risk Assessment document
Undertake Sequential Test Assessment
Undertake Exception Test Assessment (if required)
Assess access and escape routes in times of flood
Calculate flood compensation
Evaluate the impact of climate change on development
Give preliminary advice on flood warning and evacuation procedures
Recommend appropriate mitigation measures or flood resilient construction techniques
Recommends finish flood levels
Allows for one set of consolidated comments/amendments following the first issue of the report
What we need from you:
Site Address
Development plans
Sections and elevations of the site
Topographical Ground Levels
Assumptions
Site visits and Attendance of meetings excluded
Flood Warning & Evacuation Plan are not required
Ground level information for the site is given
River modelling isn't required